Basic requirements for the land
Location – CITY Residential / Workers’ quarter
Facade
Convenient entry and exit
Sleeping microdistrict nearby
Near a gas station or shopping center
Travel speed not higher than 60 km / h
In the line of sight of passing vehicles
Utilities Water, Electricity, Sewerage, Heating in winter washing GAS SOLID FUEL EQUIPMENT
Plan copy 1: 500 plot for analysis and point on the map
Land area from 800 sq. M. – 2000 sq. M., Depending on how many posts

Автомойки самообслуживания
PLAN TO OPEN THE CARWASH SELF SERVICE
The action plan is as follows
1 on your site on the plan 1: 500 we make a drawing of the carwash
2 You agree and receive the Town-planning conditions
3 Obtain a Building Permit
4 We can start construction and sign a contract for the supply of equipment
5 In the process of construction and improvement, equipment is being manufactured in parallel
6 At the same time, you receive the TU for connecting the Sewerage Water of the Electricity of Gas (if the heating is GAZ)
Technical requirements
Water city priority or Well connection pipe 42 mm pressure from 3.5 bar 3500 per hour
Electricity for 6 posts 380 Volts, 50-60 kW
Sewerage City drain about 10,000 liters per day
Gas connection standard boiler for 90 kW or two for 45 kW
We build according to our drawings, which we will prepare after signing the contract
The construction contractor is ours or on your side, but with strict adherence to our drawings
The construction and improvement process takes about 3 months
7 After the complete completion of construction, we proceed to the installation
8 Installation time 7-14 days
9 Putting the washer into operation
We train your staff and set up a marketing program for your car wash
We provide supply of Chemistry Spare Parts